Download Free Print-Only PDF OR Purchase Interactive PDF Version of this Form
Form A Applicants Questionaire Form. This is a California form and can be use in Los Angeles Local County.
Loading PDF...
Tags: Form A Applicants Questionaire, 338938, California Local County, Los Angeles
FORM A: APPLICANT QUESTIONNAIRE
NAME OF COMPANY
COMPANY CONTACT
1. Reason for Submittal - circle A, B, C, or D and complete the corresponding questions.
A. New Permit (for new companies and for changes in ownership)
Type of business
Is the facility new or existing?
If existing, previous company name
Type of business
Industrial Wastewater Discharge Permit No.
Provide a description of all manufacturing processes below or in an attachment.
Provide a description of all wastewater producing operations below or in an attachment.
Are any changes being made to the facility’s existing wastewater pretreatment/conveyance systems?
If yes, briefly explain these modifications below or in attachments.
Is there more than one company discharging industrial wastewater at your facility?
If yes,
provide for each company its name, a separate address and a description of its operations. If feasible,
each company must apply for a separate permit and must have its own incoming water meter and a
separate industrial wastewater sampling point.
If your facility will involve a new connection to the public sewer, please mark the point of connection:
Local city sewer,
Sanitation Districts’ trunk sewer.
If you are relocating, and had a previous Industrial Wastewater Discharge Permit, give your previous
address
, and permit number
.
If you have received a temporary permit, give permit number
.
All submittals for new permits must include a permit application, plans (if changes have occurred) and
pertinent supporting information.
B. Revision of Existing Permit (for a 25 percent or more change in wastewater quantity/quality)
If you have received a temporary permit, give permit number
.
Has your wastewater quantity and/or quality changed over 25 percent?
. If yes, documentation
addressing the magnitude and reason(s) for the change must be submitted. If no, a revision is not
required at this time.
Have there been any changes in production processes, wastewater pretreatment systems or sewerage
plumbing?
If yes, submit plans and describe these changes in attachments.
All submittals for a revised permit must include a permit application, plans (if changes have occurred)
and supporting information.
C. Addendum to Permit (for modifications to the wastewater conveyance/pretreatment system)
Permit Number
.
Attach a brief summary of the existing conditions and the proposed changes.
Submittal must include plans and supporting information.
The applicant must also answer the questions on the back of this form.
#338938 v1
American LegalNet, Inc.
www.FormsWorkflow.com
D. Permit Renewal (for permits with expiration dates)
Permit Number
.
Have there been any changes in production processes, wastewater pretreatment systems or sewerage
plumbing?
. If yes, submit plants and describe these changed in attachments.
All submittals for a permit renewal must include a permit application, plans (if changes have occurred)
and supporting information.
2. Supporting Information Required
All submittals must include the following forms, which are included in Appendix 6.1:
Form A - Applicant Questionnaire
Form B - Calculation of Industrial Wastewater Discharge Flow Rate
Form C - Tank Schedule and Spill Containment Calculations
Form D - Check List
Furthermore, your company must answer the questions below to determine the additional supporting
information that must be provided:
A. Waste Minimization (refer to Sections 2.4 and 3.3 E)
Please describe below or in an attachment all of your company’s existing/proposed pollution prevention
measures (e.g., reuse, product reformulation, process changes, housekeeping measures, etc.):
Has your company previously submitted a waste minimization plan to the Districts?
. If the
answer is no, please read Sections 2.4 and 3.3E and submit the appropriate plan (if applicable). Your
company is encouraged to obtain information on source reduction measures and options for your
industrial processes by calling the Districts’ Industrial Waste Section at (562)699-7411, ext. 2900.
B. Wastewater Quality (refer to Section s 3.3G and H)
Please provide the results of at least two 24-hour composite analyses attesting to concentrations of
chemical oxygen demand, suspended solids and any priority or regulated pollutants that may be found
in your wastewater. Your company must also provide material safety data sheets of all chemicals used
in the facility that may directly or indirectly contaminate your wastewater.
C. New Equipment (refer to Sections 3.3 F, J. and K)
Is your company installing new pretreatment, monitoring, conveyance or industrial equipment that may
have an impact on the quality or quantity of your wastewater?
. If yes, please provide catalog
cuts of all units and important details such as: number of units, sizes, hours of operation, pump rating
curves, operating parameters, etc.
D. Baseline Monitoring Report (refer to Sections 2.1 and 3.3 I)
Does your company currently fall under one of EPA’s categories?
. If yes, your company must
submit a Baseline Monitoring Report, unless it submitted one in the past and there have been no
changes in operations that may change your categorical standards.
E. Rainwater Management (refer to Section 3.2)
Are there any outdoor drains, trenches or sumps at your facility that are connected to the sewerage
system?
. If yes, your company must submit plans and information that describe the existing
means to divert rainwater from the sewerage system or a proposal to comply with the Districts’
rainwater guidelines. Please be informed that new automatic rainwater diversion systems will not be
approved unless the applicant proves that this is the only feasible alternative.
American LegalNet, Inc.
www.FormsWorkflow.com