Indiana Department of Environmental Management
Office of Air Management
Permit Application
State Form 49554 (11/99)
FORM
BACT-01b
Cost/Economic Impact Analysis
1/2000
COST/ECONOMIC IMPACT ANALYSIS
Complete this form for each BACT option in which cost and economic impacts are to
be considered. On this form, do not include costs that would be incurred
regardless of whether the BACT option is chosen. Attach a copy of the cost
estimates in a format such that IDEM, OAM staff can easily reproduce the cost
estimates. If the particular item is not applicable to the BACT option being
evaluated, indicate ANot Applicable@ (N/A) in the appropriate blanks. Add
additional lines and/or copy the forms as necessary.
Source Information
Facility:
Unit ID:
BACT Option:
Pollutant:
TOTAL CAPITAL INVESTMENT
Total Capital Investment (TCI) is the total direct and indirect capital costs
associated with implementation of a BACT option. Use Tables A and B to indicate
the direct and indirect capital costs that would be incurred above the baseline
project costs. Summarize the total capital costs in Table C. Attach vendor
quotes and additional sheets as necessary.
A.
Direct Capital Costs
Cost
Estimate
Item*
Reference/Source of Cost
Estimate
Purchased Equipment Costs
1.
Equipment Costs (Itemize below)
$
$
$
$
2.
Instrumentation
$
3.
Sales Tax
$
4.
Freight
$
5.
Other (please specify)
$
6.
Purchased Equipment Subtotal
$
(Sum of Items 1, 2, 3, 4, and 5)
*Add lines as necessary
BACT-01b
Page 1 of 8
American LegalNet, Inc.
www.FormsWorkflow.com
Indiana Department of Environmental Management
Office of Air Management
Permit Application
State Form 49554 (11/99)
FORM
BACT-01b
Cost/Economic Impact Analysis
1/2000
Facility:
Unit ID:
BACT Option:
Pollutant:
A.
Direct Capital Costs (continued)
Cost
Estimate
Item*
Reference/Source of Cost
Estimate
Direct Installation Costs
7.
Foundations and Supports
$
8.
Auxiliaries (duct work, fittings
- include only the equipment
which would not be necessary if
the facility was not controlled)
$
9.
Handling and Erection
$
10.
Piping
$
11.
Insulation and Painting
$
12.
Electrical
$
13.
Site Preparation
$
14.
Other (please specify)
$
15.
Direct Installation Costs
Subtotal (Sum of Items 7, 8, 9,
$
10, 11,
12, 13, and 14)
16.
DIRECT CAPITAL COSTS SUBTOTAL
(Sum
$
of Items 6 and 15)
Comments/Explanation
*Add lines as necessary
BACT-01b
Page 2 of 8
American LegalNet, Inc.
www.FormsWorkflow.com
Indiana Department of Environmental Management
Office of Air Management
Permit Application
State Form 49554 (11/99)
FORM
BACT-01b
Cost/Economic Impact Analysis
1/2000
Facility:
Unit ID:
BACT Option:
Pollutant:
B.
Indirect Installation Costs
Cost
Estimate
Item*
1.
Engineering and Supervision
$
2.
Lost Production (for retrofit
situations only)
$
3.
Construction and Field Expenses
$
4.
Contractor Fees
$
5.
Start-up and Performance Tests
$
6.
Over-all Contingencies
$
7.
Working Capital (if applicable)
$
8.
Reference/Source of Cost
Estimate
Other (please specify)
$
9.
INDIRECT INSTALLATION COSTS
SUBTOTAL (Sum of Items 1, 2, 3, 4,
$
5, 6,
7, and 8)
Comments/Explanation
*Add lines as necessary
BACT-01b
Page 3 of 8
American LegalNet, Inc.
www.FormsWorkflow.com
Indiana Department of Environmental Management
Office of Air Management
Permit Application
State Form 49554 (11/99)
FORM
BACT-01b
Cost/Economic Impact Analysis
1/2000
Facility:
Unit ID:
BACT Option:
Pollutant:
C. Capital Cost Summary
1.
Total Capital Investment Subtotal
(Sum of Table A, Item 16 and Table B,
$
Item 9)
2.
Capital Recovery Factor
a.
b.
3.
Interest Rate
Economic Lifetime
CAPITAL RECOVERY COST
$
Comments/Explanation
*Add lines as necessary
BACT-01b
Page 4 of 8
American LegalNet, Inc.
www.FormsWorkflow.com
Indiana Department of Environmental Management
Office of Air Management
Permit Application
State Form 49554 (11/99)
FORM
BACT-01b
Cost/Economic Impact Analysis
1/2000
Facility:
Unit ID:
BACT Option:
Pollutant:
TOTAL ANNUAL COST
Total Annual Cost includes the direct and indirect costs and recovery credits
associated with implementation of a BACT option. Use Tables D and E to indicate
the annual costs that would be incurred above the baseline project costs. Use
Table F to indicate the recovery credits that would be realized after
implementation of the BACT option. Summarize the total annual costs in Table G.
Attach vendor quotes and additional sheets as necessary.
D.
Direct Annual Costs
Cost
Estimate
Item*
1.
Reference/Source of Cost
Estimate
Operating Labor (Itemize below)
$
$
2.
Maintenance Labor (Itemize below)
$
$
3.
Materials (Itemize below)
$
$
4.
Utilities (Itemize below)
$
$
5.
Waste Treatment and Disposal (Itemize below)
$
$
6.
Replacement Parts (Itemize below)
$
$
7.
Other (please specify)
$
8.
DIRECT ANNUAL COSTS SUBTOTAL
$
(Sum of Items 1, 2, 3, 4, 5, 6, and 7)
BACT-01b
Page 5 of 8
American LegalNet, Inc.
www.FormsWorkflow.com
Indiana Department of Environmental Management
Office of Air Management
Permit Application
State Form 49554 (11/99)
FORM
BACT-01b
Cost/Economic Impact Analysis
1/2000
Facility:
Unit ID:
BACT Option:
Pollutant:
Comments/Explanation
(Regarding Table D)
*Add lines as necessary
E.
Indirect Annual Costs
Item*
Cost
Estimate
1.
Overhead
$
2.
Property Taxes, Insurance, and
Administrative Charges
$
3.
Reference/Source of Cost
Estimate
Other (please specify)
$
4.
INDIRECT ANNUAL COSTS SUBTOTAL
$
(Sum of Items 1, 2, and 3)
Comments/Explanation
*Add lines as necessary
BACT-01b
Page 6 of 8
American LegalNet, Inc.
www.FormsWorkflow.com
Indiana Department of Environmental Management
Office of Air Management
Permit Application
State Form 49554 (11/99)
FORM
BACT-01b
Cost/Economic Impact Analysis
1/2000
Facility:
Unit ID:
BACT Option:
Pollutant:
F.
Recovery Credits
Credit
Estimate
Item*
1.
Reference/Source of Credit
Estimate
Materials Recovered
$
2.
Energy Recovered
$
3.
Other (please specify)
$
4.
RECOVERY CREDITS SUBTOTAL
(Sum of
$
Items 1, 2, and 3)
Comments/Explanation
*Add lines as necessary
G. Total Annual Cost Summary
1.
Direct Annual Costs Subtotal from Table D, Item 8
$
2.
Indirect Annual Costs Subtotal from Table E, Item 4
$
3.
Recovery Credits Subtotal from Table F, Item 4
$
4.
TOTAL ANNUAL COST SUBTOTAL
$
(Item 1 plus Item 2 Minus Item 3)
BACT-01b
Page 7 of 8
American LegalNet, Inc.
www.FormsWorkflow.com
Indiana Department of Environmental Management
Office of Air Management
Permit Application
State Form 49554 (11/99)
FORM
BACT-01b
Cost/Economic Impact Analysis
1/2000
Facility:
Unit ID:
BACT Option:
Pollutant:
TOTAL ANNUALIZED COST SUMMARY
H. Total Annualized Cost Summary
1.
Capital Recovery Cost from Table C, Item 3
$
2.
Total Annual Cost Subtotal from Table G, Item 4
$
3.
TOTAL ANNUALIZED COST(TAC)(Sum
$
I.
of Items 1 and 2)
Cost Effectiveness
1.
Baseline Emissions Rate (tons per year)
2.
Post-BACT Emissions Rate (tons per year)
3.
Total Pollutant Removed (tons per year)
(Difference of Item 1
and Item 2)
4.
AVERAGE COST EFFECTIVENESS OF BACT OPTION ($/ton of
pollutant removed) (Divide Table H, Item 3 by Table I, Item 3)
Comments/Explanation
Attachments:
List attachments in the space below.
BACT-01b
Page 8 of 8