PARTICULATE CONTROL EQUIPMENT: Cyclone – INSTRUCTIONS
Microsoft Word version of CE-03
Adobe PDF version of CE-03
The purpose of CE-03 (state form 52620) is to summarize all of the physical and operational parameters of a cyclone
used to control particulate emissions. Complete this form once for each control device (or once for each set of identical
control devices). CE-03 is a required form for submitting information about a cyclone to IDEM, OAQ. For the purposes of
this form, the term “source” refers to the plant as a whole and NOT to the individual emissions units.
If you have any questions, contact the Air Permit Reviewer of the Day (PROD) at (317) 233-0178 or 1-800-451-6027
extension 3-0178 (toll free call within Indiana).
Part A: Identification and Description of Control Equipment
Part A identifies the particulate control device and to describe its physical properties.
1. Control Equipment ID:
Provide the identification number for each device used to control or limit air pollutant emissions. The identification
numbers listed on this form should correspond to the emissions unit identified on the Plant Layout diagram and
Process Flow diagram.
2. Installation Date:
Specify when the control equipment was installed. At a minimum, the month and year of installation is required.
3. Number of Tubes:
Specify the number of tubes for the cyclone. For multiple tubes, specify whether the tubes are arranged in parallel or
in series.
4. Is an Alarm / Detector Installed on this devices?
Specify whether or not an alarm or detection system is installed on the control device. If such a system is present,
briefly describe the system.
Part B: Operational Parameters
Part B provides the operational parameters of the control device and the pollutant laden gas stream. Appropriate units
must be included if the standard units are not used.
5. Gas Stream Flow Rate:
Provide the volumetric flow rate of the gas stream prior to entering the control device, after leaving the control device,
and include the calculation of the difference in flow rate between the inlet and outlet of the device. You must also
include the units for flow rate. Air flow rates are typically provided in actual cubic feet per minute (acfm).
6. Gas Stream Temperature:
Provide the average temperature of the gas stream prior to entering the control device, after leaving the control
device, and include the calculation of the difference in temperature between the inlet and outlet of the device. You
must also indicate the temperature scale used. Air stream temperatures are typically provided in degrees Fahrenheit
(°F).
7. Gas Stream Pressure:
Provide the pressure applied to the gas stream prior to entering the control device, after leaving the control device,
and include the calculation of the difference in pressure between the inlet and outlet of the device. You must also
include the units of pressure. Air pressure is typically provided in inches of water (in H2O) or pounds per square inch
(psi) or millimeters of mercury (mm Hg).
8. Moisture Content:
Provide the moisture content of the gas stream prior to entering the control device, after leaving the control device,
and include the calculation of the difference in moisture content between the inlet and outlet of the device. Moisture
content is typically provided as a percent (%).
9. Average Particle Size Range:
Provide the average size range of the particulates in the gas stream prior to entering the control device, after leaving
the control device, and include the calculation of the difference in size range of particulates between the inlet and
outlet of the device. Particulate size range is typically provided in micrometers (μm).
10. Other:
Specify any other parameter of the control device, and provide the appropriate value for the parameter prior to
American LegalNet, Inc.
www.FormsWorkflow.com
entering the control device, after leaving the control device, and include the calculation of the difference between the
inlet and outlet of the device. Specify the units of measure used for the control device parameter.
Part C: Pollutant Concentrations
Part C provides the operational parameters of the particulate control device and the pollutant laden gas stream.
Appropriate units must be included if the standard units are not used.
11. Units:
For each pollutant controlled, provide the units of measure for each concentration. Pollutant concentrations are
typically provided in pounds per hour (lb/hr), tons per year (tpy), parts per million by volume (ppmv) or in milligrams
per liter (mg/L), or in grains per dry standard cubic foot (gr/dscf).
12. Inlet:
For each pollutant controlled, provide the concentration of the pollutant in the gas stream prior to entering the control
device.
13. Outlet:
For each pollutant controlled, provide the concentration of the pollutant in the gas stream after leaving the control
device.
14. Efficiency:
Provide a capture and control efficiency for each pollutant controlled by the control device.
Capture
The capture efficiency of the control device is the amount of the contaminated gas stream that is collected by the
control device. Provide the particulate capture efficiency for the control device. Efficiency is typically provided as a
percent (%).
Control
The control efficiency of the control device is the amount of contaminant that is removed from the captured gas
stream by the control device. Provide the particulate control efficiency for the control device. Efficiency is typically
provided as a percent (%).
Part D: Monitoring, Record Keeping, & Testing Procedures
Part D identifies any existing or proposed monitoring, record keeping, & testing procedures that may need to be included
in the permit.
15. Items Monitored:
Specify what is or will be monitored for each control device. For example, “pressure drop across the baghouse”.
16. Monitoring Frequency:
Specify the frequency for each monitored item (e.g., “once per shift”).
17. Items Recorded:
List what records are or will be kept for each listed control device (e.g., “raw material usage”).
18. Record Keeping Frequency:
Specify the record keeping frequency for each recorded item (e.g., “daily log of material usage”).
19. Pollutants Tested:
For each listed emissions unit, list the performance tests conducted. For the pressure drop example, the performance
test would be for “particulate matter”.
20. Test Methods:
If the applicable requirement requires the use of a specific test method, identify the test method. Standard testing
methods are provided by the American Society for Testing and Materials (ASTM). If no specific test method is
required, describe the methods used to for the performance test.
21. Testing Frequency:
Specify the testing frequency for each performance test (e.g., “annually”).
Part E: Preventive Maintenance Plan
Part E verifies that a complete Preventive Maintenance Plan (PMP) has been prepared for the control device, if
applicable. Use this table as a checklist to ensure that the PMP is complete.
American LegalNet, Inc.
www.FormsWorkflow.com
22. Do you have a Preventive Maintenance Plan (PMP)?
Specify whether or not a Preventive Maintenance Plan (PMP) is needed for the control device. If the PMP is needed,
use the checklist items A-D to verify that the PMP is complete.
A. Identification of the individual(s) responsible for inspecting, maintaining and repairing emission control
devices.
Identify the individual(s) responsible for inspecting, maintaining and repairing emission control devices.
B. Description of the items or conditions that will be inspected.
Describe the items or conditions that will be inspected.
C. Schedule for inspection of items or conditions described above.
Specify the schedule for inspection of items or conditions described above.
D. Identification and quantification of the replacement parts that will be maintained in inventory for quick
replacement.
Identify and quantify the replacement parts that will be maintained in inventory for quick replacement.
Part F: Determination of Integral Control
Part F provides explanation to determine whether the control device should be considered integral to the process.
23. Has IDEM already made an integral control determination for this device?
Specify whether or not IDEM has previously made an integral control determination for this device. If IDEM has
previously made an integral control determination, provide the Permit Number, the Issuance Date, and whether or not
the device was determined to be Integral to the process.
24. Is this device integral to the process?
Indicate whether or not the device should be considered integral to the process, and if applicable, provide the
reason(s) why the device is integral.
***SUBMISSION OF CONFIDENTIAL RECORDS***
All information submitted to IDEM will be made available to the public unless it is submitted under a claim of
confidentiality. Claim of confidentiality must be made at the time the information is submitted to IDEM, and must follow
the requirements set out in 326 IAC 17.1-4-1. Failure to follow these requirements exactly will result in your confidential
information becoming a public record, available for public inspection. To ensure that your information remains
confidential, refer to the IDEM, OAQ information regarding submittal of confidential business information. For more
information on confidentiality for certain types of business information, please review IDEM’s Nonrule Policy Document
Air-031-NPD regarding Emission Data.
American LegalNet, Inc.
www.FormsWorkflow.com
CD-03 – COMPLIANCE PLAN REQUIREMENTS PER
EMISSIONS UNIT
State Form 51863 (R / 9-04)
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
NOTES:
The purpose of CD-03 is to identify existing compliance monitoring
activities (monitoring, testing, record keeping and/or reporting) required in
an applicable requirement or to provide compliance monitoring activities for
applicable requirements where there is no or inadequate compliance
monitoring requirements.
IDEM - Office of Air Quality - Permits Branch
100 N. Senate Avenue
Indianapolis, IN 46204
Telephone: (317) 233-0178 or
Toll Free: 1-800-451-6027 x30178 (within Indiana)
Facsimile Number: (317) 232-6749
Http://www.IN.gov/idem/air/permits/index.html
FOR OFFICE USE ONLY
PERMIT NUMBER:
CD-03 focuses on specific applicable requirements that may apply to a single
emission unit or group of emission units.
This is required form for each initial Title V permit application as well as each
modification and every renewal.
Detailed instructions for this form are available online at
http://www.IN.gov/idem/air/permits/apps/instructions/cd03instructions.html.
All information submitted to IDEM will be made available to the public unless it
is submitted under a claim of confidentiality. Claims of confidentiality must be
made at the time the information is submitted to IDEM, and must follow the
requirements set out in 326 IAC 17.1- 4-1. Failure to follow these requirements
exactly will result in your information becoming a public record, available for
any one to inspect and photocopy.
PART A: Identification of Source and Applicable Requirement
Part A is intended to identify the source and the emissions unit. Use one form for each emissions unit. For the purposes
of this form, the term “source” refers to the plant site as a whole and NOT to individual emissions units.
1. Source Name:
2. Source ID:
3. Emissions Unit Description:
4. Unit ID:
5. Limitations: List each operational and/or emission limit for this emissions unit.
6. Reporting Schedule: Provide a description of the reporting schedule to be used. The schedule should include
what will be reported and how often the reports will be submitted.
Compliance Plan Requirements Per Emissions Unit (CD03)
Page 1 of 2
American LegalNet, Inc.
www.FormsWorkflow.com
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
OFFICE OF AIR QUALITY
State Form 51863 (R / 9-04)
Compliance Plan Requirements Per Emissions Unit
FORM CD-03
PART B: Compliance Plan Components
Part B is intended to identify the main components of each required compliance plan.
7. Rule Cite
8. Control
Equipment
9. Parameters
Monitored
Compliance Plan Requirements Per Emissions Unit (CD-03)
10. Monitoring
Frequency
11. Item
Recorded
12. Record
Keeping
Frequency
13. Pollutants
Tested
14. Test
Method
15. Testing
Frequency
Page 2 of 2