GSD-03 – Process Flow Diagram – INSTRUCTIONS
Microsoft Word version of GSD-03
Adobe PDF version of GSD-03
The purpose of GSD-03 (State Form 51599) is to provide a checklist for identifying the information to be included on each
Process Flow diagram. (You will also need to submit the appropriate Process Information (PI) form for each process.) A
GSD-03 form and the associated Process Flow diagram are required for each process included in any air permit
application submitted to IDEM, OAQ. For the purposes of this form, the term “source” refers to the plant as a whole and
NOT to the individual emissions units. If you do not provide the enough information to adequately describe the process,
the application process may be stopped.
NOTE: IDEM, OAQ has provided an example of a basic process flow diagram on the Air Permit Applications Forms
website. This is only an example and has not been drawn to scale. You are not limited to this illustration; add
any information you feel is necessary to fully describe the process.
If you have any questions, contact the Air Permit Reviewer of the Day (PROD) at (317) 233-0178 or 1-800-451-6027
extension 3-0178 (toll free call within Indiana).
Part A: Process Flow Diagram
Part A provides basic information to understanding the nature of the process. Please use this table as a checklist to
indicate that you have included the following items on your process flow diagram (All throughputs should be given in
pounds per hour.):
1. Process Description:
Briefly describe the process in the space provided and also on the process flow diagram.
2. Process Equipment:
Check this box to indicate that you have shown all equipment used in the process on the process flow diagram. You
will also need to include the emissions unit identification numbers that will be used throughout the application to refer
to this equipment.
3. Raw Material Input:
Identify all raw materials used, and state the raw material input at each step of the process in pounds per hour
(lbs/hr).
4. Process Throughput:
Identify all intermediate and final products, and state the maximum process throughput (maximum capacity) in pounds
per hour (lbs/hr) at each step of the process.
5. Additions / Deletions / Modifications:
Identify any additional equipment that has been added since the last time the permit was updated. State if any
equipment was deleted since the last time the permit was updated. Identify any proposed modifications to the
existing process. Use the space provided to briefly explain the impacts of the additional equipment, the reason for
removing any equipment, and/or the reason for the proposed modification. (If additional space is needed, please
attach a separate sheet with the information and indicate that additional information is attached.)
Part B: Process Operation Schedule
Part B is intended to indicate the actual hours of operation for the process.
NOTE: Indiana Law requires permit emission limits to be based on the potential to emit (PTE) air pollutants as if the
process was operating at full capacity 24 hours per day, seven (7) days per week. It is important to provide
the actual hours of operation so we can compare the potential to emit with actual estimated emissions. Some
sources may opt to take a limit on the potential to emit for the entire source, or individual processes, in order
to better reflect the actual operating scenario.
6. Process Operation Schedule:
Indicate the actual operation schedule for each process in hours per day (hr/d), days per week (d/wk), and weeks per
year (wk/yr). If individual emissions units operate on different schedules, include the actual operation schedule for
each emissions unit. If there will be scheduled periods of downtime, please include as much information as is known
at the time of application.
American LegalNet, Inc.
www.FormsWorkflow.com
7. Scheduled Downtime:
Use the space provided to include as much information as is known about scheduled periods of downtime for this
process. (If additional space is needed, please attach a separate sheet with the information and indicate that
additional information is attached.)
Part C: Emissions Point Information
Part C provides information about each potential outlet of air pollutant emissions to the atmosphere. Please use this table
as a checklist to indicate that you have included the following items on your process flow diagram (All throughputs should
be given in pounds per hour.):
8. Stack / Vent Information:
Each stack or vent is a point along the process where air pollutant emissions may be generated. Identify all the
emission points for the process and denote which stack or vent is used to vent the emissions to the atmosphere. If
the process is vented inside the building, identify where the fugitive emissions are most likely to escape through
building doors and windows. You will also need to include the stack identification, height, diameter, gas discharge
temperature, and gas flow rate for each of these emission points on form GSD-04, Stack/Vent Information.
9. Pollutants Emitted:
Identify all pollutants released to the atmosphere in pounds per hour (lbs/hr) during normal operation and at each step
of the process.
10. Air Pollution Control:
Identify all air pollution control equipment and control techniques used at each step of the process. For each method
of control, indicate what air pollutants will be abated. For each piece of control equipment, state the control and
capture efficiencies and include a unique identification number for the device.
Part D: Process Flow Diagram
Part D provides a place for a hand drawn process flow diagram. It is optional to use this space to create your process
flow diagram, but you must include the diagram with your application. If you choose to submit the process flow diagram in
a different format, state “process flow diagram attached” in the space provided, and submit the information with your
completed application. IDEM, OAQ has provided an example of a basic process flow diagram on the Air Permit
Applications Forms website.
***SUBMISSION OF CONFIDENTIAL RECORDS***
All information submitted to IDEM will be made available to the public unless it is submitted under a claim of
confidentiality. Claim of confidentiality must be made at the time the information is submitted to IDEM, and must follow
the requirements set out in 326 IAC 17.1-4-1. Failure to follow these requirements exactly will result in your confidential
information becoming a public record, available for public inspection. To ensure that your information remains
confidential, refer to the IDEM, OAQ information regarding submittal of confidential business information. For more
information on confidentiality for certain types of business information, please review IDEM’s Nonrule Policy Document
Air-031-NPD regarding Emission Data.
American LegalNet, Inc.
www.FormsWorkflow.com
OAQ GENERAL SOURCE DATA APPLICATION
GSD-03: Process Flow Diagram
IDEM - Office of Air Quality – Permits Branch
100 N. Senate Avenue, Indianapolis, IN 46204-2251
Telephone: (317) 233-0178 or
Toll Free: 1-800-451-6027 x30178 (within Indiana)
Facsimile Number: (317) 232-6749
www.in.gov/idem/permits/air/index.html
State Form 51599 (R2 / 9-06)
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
•
The purpose of GSD-03 is to provide a checklist for identifying the information to be included on each Process Flow
diagram.
•
Complete this form and submit a process flow diagram for each process included in your air permit application.
•
IDEM, OAQ has provided detailed instructions for this form and an example of a basic process flow diagram on the
Air Permit Applications Forms website.
•
NOTES:
All information submitted to IDEM will be made available to the public unless it is submitted under a claim of
confidentiality. Claims of confidentiality must be made at the time the information is submitted to IDEM, and must
follow the requirements set out in 326 IAC 17.1-4-1. Failure to follow these requirements exactly will result in your
information becoming a public record, available for public inspection.
Part A: Process Flow Diagram
Part A provides basic information to understanding the nature of the process. Please use this table as a checklist to
indicate that you have included the following items on your process flow diagram (All throughputs should be given in
pounds per hour.):
1.
Process Description:
2.
Process Equipment
5.
Additions
3.
Deletions
Raw Material Input
4.
Process Throughput
Modifications
Use the space below to briefly explain the impacts of the additional equipment, the reason for removing any equipment,
and/or the reason for the proposed modification. (If additional space is needed, please attach a separate sheet with the
information and indicate in the space below that additional information is attached.)
Part B: Process Operation Schedule
Part B indicates the actual (or estimated actual) hours of operation for the process.
6.
7.
Process Operation Schedule
Hours per Day
Days per Week
Weeks Per Year
Scheduled Downtime: Use the space below to include as much information as is known about scheduled periods
of downtime for this process. (If additional space is needed, please attach a separate sheet with the information
and indicate in the space below that additional information is attached.)
Part C: Emissions Point Information
Part C provides information about each potential outlet of air pollutant emissions to the atmosphere. Please use this
table as a checklist to indicate that you have included the following items on your process flow diagram (All throughputs
should be given in pounds per hour.):
8.
Stack / Vent Information
9.
Pollutants Emitted
10.
Air Pollution Control
Continued on Next Page
Page 1 of 2
American LegalNet, Inc.
www.FormsWorkflow.com
Indiana Department Of Environmental Management
Office Of Air Quality
State Form 51599 (R2 / 9-06)
Air Permit Application
FORM GSD-03
Page 2 of 2
Part D: Process Flow Diagram
This space provides a place for a hand drawn process flow diagram. It is optional to use this space to create your process flow diagram, but you must include
the diagram with your application. If you choose to submit the process flow diagram in a different format, state “process flow diagram attached” in the space
provided, and submit the information with your completed application. IDEM, OAQ has provided an example of a basic process flow diagram on the Air Permit
Applications Forms website.