Download Free Print-Only PDF OR Purchase Interactive PDF Version of this Form
Construction Notification Form. This is a Indiana form and can be use in Department Of Enviromental Management Statewide.
Loading PDF...
Tags: Construction Notification, 51911, Indiana Statewide, Department Of Enviromental Management
CONSTRUCTION NOTIFICATION
State Form 51911 (9-04)
National Pollutant Discharge Elimination System for Concentrated Animal Feeding Operations
INSTRUCTIONS:
INDIANA DEPARTMENT OF
ENVIRONMENTAL MANAGEMENT
Confined Feeding Section
Office of Land Quality (N1154)
100 North Senate Avenue, P.O. Box 6015
Indianapolis, Indiana 46206-6015
This sheet must be completed, signed, dated and returned to IDEM prior to commencement of construction activities. This form may
be used multiple times during a phased construction project.
Construction Notification Regulations:
327 IAC 15-15-7(d)
To provide the department with the opportunity to inspect the system or structure, the owner or operator shall notify the department
prior to the commencement of construction on a new waste management system or structure.
I. GENERAL INFORMATION
A. PERMIT NUMBER
NPDES CAFO Permit #:
B. FACILITY INFORMATION
Name:
Telephone:
Location Address:
Facsimile:
City:
State:
ZIP Code:
County:
C. CONTACT INFORMATION
Owner Name:
Telephone:
Address:
Facsimile:
City:
State:
ZIP Code:
Operator Name:
Telephone:
Address:
Facsimile:
City:
State:
ZIP Code:
II. CONSTRUCTION INFORMATION
Construction Start Date:
Name of Contractor:
Telephone:
Address:
Facsimile:
City:
State:
ZIP Code:
Does the current construction plan differ from what was submitted to IDEM?
yes
no
(circle one)
If yes, in accordance with 327 IAC 15-15-5(g), any change in information submitted in the notice of intent (NOI) should be reported
immediately to IDEM. Changes that are reasonably expected to alter the characteristics of the discharge from the operation
regulated under a general permit rule must be reported prior to the change. Additionally, 327 IAC 15-15-5(h) states when a
permittee becomes aware that incomplete or incorrect information was submitted with the NOI to IDEM, the permittee must submit
the complete or correct information to IDEM upon discovery of the omission or error. 327 IAC 15-15-7(c) states construction may
not begin until written notification from IDEM that the NOI contains all required information and is complete. Any updates or
changes in the NOI materials must be submitted to the address listed above.
III. CERTIFICATION
“I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or person who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that
there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations.”
A. NAME AND OFFICIAL TITLE (print or type)
B. PHONE NUMBER (area code and number)
C. SIGNATURE
D. DATE SIGNED
American LegalNet, Inc.
www.FormsWorkflow.com