Download Free Print-Only PDF OR Purchase Interactive PDF Version of this Form
Industrial Streamlined Mercury Variance (SMV) Application Form. This is a Indiana form and can be use in Department Of Enviromental Management Statewide.
Loading PDF...
Tags: Industrial Streamlined Mercury Variance (SMV) Application, 52111, Indiana Statewide, Department Of Enviromental Management
INDUSTRIAL STREAMLINED
MERCURY VARIANCE (SMV) APPLICATION
State Form 52111 (5-05)
Approved by State Board of Accounts, 2005
Indiana Department of Environmental Management
Office of Water Quality – Mail Code 65-42
NPDES Permits Branch
100 North Senate Avenue
Indianapolis, Indiana 46204-2251
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
PART ONE: General Information
Name of Facility
Facility Address
City or Town
State
ZIP Code
County
National Pollutant Discharge Elimination System (NPDES) Permit No.:
Name of Person in Responsible Charge
Title
Address
City or Town
State
ZIP Code
Name of Primary Contact Person
Address
City or Town
State
ZIP code
Telephone No.
E-mail Address (if available)
NPDES Outfall(s) Affected by Streamlined Mercury Variance Request:
Receiving Stream(s) Affected by Streamlined Mercury Variance Request:
Average Daily Flow:
Provide a brief description of all operations contributing to the permitted discharge(s):
SIGNATURE BLOCK
This application must be signed by a person in responsible charge (see 327 IAC 5-2-22) to be valid. This signature attests to the following:
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure
that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those
persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Printed Name
Title
Signature
Date Signed (month, day, year)
Return the completed SMV application package (Parts I - V) and $50 application fee
(see IC 13-18-20-12(a)(4)) to mailing address listed above.
American LegalNet, Inc.
www.FormsWorkflow.com
PART TWO – POLLUTANT MINIMIZATION PROGRAM PLAN (PMPP) INVENTORY/IDENTIFICATION
A.
Provide a preliminary inventory of potential uses and sources of mercury in all buildings and departments, as well as a preliminary
identification of known mercury-bearing equipment, wastestreams, and mercury storage sites. The following checklist* includes many of
the chemicals, equipment, locations, etc. where mercury may be present at your site. For the purpose of satisfying the requirements of this
section, you may submit the completed checklist as a preliminary inventory/identification. While the checklist is intended to facilitate the
inventory/identification process, it should not be considered as all-inclusive for purposes of establishing a complete inventory. (see 327 IAC
5-3.5-9(a)(1) and 327 IAC 5-3.5-9(a)(2))
LABORATORY EQUIPMENT
Manometers
Ion exchange cartridges for lab water purification system
Barometers
Hanging mercury drop electrodes for polarographic analyzers
Thermometers
Mercury Hallow Cathode lamp for AA analysis
LABORATORY CHEMICALS
COD analysis reagent (mercuric sulfate)
Mercury or mercurous chloride
TKN and TP analysis digestion reagents
Mercury iodide
Nessler reagent
Mercury nitrate
Mercury analytical standards
Mercury (II) oxide
Gas chromatograph sample interferences (elemental mercury)
Mercury (II) sulfate
Sodium hypochlorite (Clorox)
Merthiolate
BULK CHEMICALS
Phosphorus removal chemicals
Dechlorination chemicals
Sludge thickening polymers
Potassium hydroxide
Sodium hydroxide
Sodium chloride
PROCESS CONTROL AND MEASURING EQUIPMENT
Accustats
Barometers
Counterweights
Elemental mercury for refilling
mercury-containing equipment
Flow meters
Gas regulators and meters
Gyroscopes
Hydrometers with thermometers
Level and rotation sensors
Manometers, pressure gauges and vacuum gauges
Mercury-sealed pistons
Permeters
Pressure-trols
Pyrometers
Rectifiers
BUILDINGS
DC watt-hour meters
Flame sensors (found in the pilot light and burner
assembly on gas-fired furnaces, boilers, unit heaters
and space heaters)
* This checklist was borrowed from the Delta Institute
Industrial Streamlined Mercury Variance Application
State Form 52111 (5-05)
Chlorine
Sodium hypochlorite
Sulfuric acid
Nitric acid
Ferric or ferrous chloride
Pickling liquor (for phosphorus removal)
Ring balances
Shunt trips
Steam flow meters
Stokes gauges
Switches and relays:
Displacement plunger relays
Mercoid control switches
Pressure control switches (mounted on bourdon tube or diaphragm)
di Relay switches
hdi h
)
Mercury wetted relays
Mercury displacement relays (found in motors)
Sump pump, bilge pump and other float controls
Tilt switches
Thermometers (including industrial dial face thermostats with capillary tubes)
T b t b
Thermostats and thermoregulators
Transmitters
Hydronic and warm air controls with tilt switches such as:
Aquastats
Pressurestats
Firestats
Fan limit controls
Pressure/flow controls on air handling units.
2
American LegalNet, Inc.
www.FormsWorkflow.com
PART TWO (CONTINUED)
BUILDINGS (continued)
Switches and relays:
Fire alarm box switches
Silent light switches
Relay switches
Mercury wetted relays
Mercury displacement relays (found in lighting, resistance heating
and motors)
Sump pump, bilge pump, flow monitor, float switches, and other
float controls
Tilt switches
Phosphorus removal chemicals:
Ferric or ferrous chloride
Pickling liquor
Thermostats
BEARINGS AND SEALS
Trickling filter Pivot Arm Bearings (mercury bearings/water seals)
LAMPS
Fluorescent
Mercury vapor lamps
High-pressure sodium
Metal halide
Mercury arc
Ultraviolet disinfection
BATTERIES
Mercury-zinc (button) batteries
Mercury alkaline batteries
Mercury-cadmium batteries
Mercury oxide batteries
PAINT
Old latex-paint (pre-1990)
Marine paint
FIRST AID/MEDICAL
Mercurochrome
Thermometers
Thimerosal (contained in eye wash)
Sphygmomanometers
OTHER
Fleet vehicles may contain ABS, convenience and trunk lighting
Old pesticides, fungicides and herbicides
switches and HID headlamps
Tree root growth control products
Computer monitors
COLLECTION SYSTEM
Lift station equipment
Sewer lines with accumulated mercury
Traps with accumulated mercury
Other mercury containing equipment
Sumps with accumulated mercury
Mercury-containing chemicals used and/or stored on-site
MERCURY STORAGE SITES
Elemental mercury
Mercury-containing items collected for disposal
B.
Provide a plan and schedule for providing a complete inventory initiated under Section A. above. (see 327 IAC 5-3.5-9(a)(1)) The
schedule required under this part should be expressed in terms of months from the date of NPDES permit issuance, renewal, or
modification that incorporates the approved SMV. It is recommended that the schedule required under this part be developed in
conjunction with the other schedules for action required by the SMV application.
A complete inventory should include an estimate of quantities (i.e., volume of chemicals used annually, or numbers of mercury containing
equipment) for each item identified in Part II.A. Additionally, a complete inventory should include documentation from chemical suppliers
and equipment suppliers of the mercury content in your most commonly purchased items. Mercury may not be present in a concentration
great enough to appear on an MSDS, yet still contribute to the overall level of mercury in the influent.
* This checklist was borrowed from the Delta Institute
Industrial Streamlined Mercury Variance Application
State Form 52111 (5-05)
3
American LegalNet, Inc.
www.FormsWorkflow.com
PART THREE - POLLUTANT MINIMIZATION PROGRAM PLAN (PMPP) PLANNED ACTIVITIES
A.
Provide a list of planned activities to be conducted to eliminate or minimize the release of mercury to waters of the state. The list of
planned activities may consider technical and economic feasibility and must include, at a minimum: (see 327 IAC 5-3.5-9(a)(3))
1.
A review of purchasing policies and procedures.
2.
Necessary training and awareness for facility staff.
3.
Evaluation of alternatives to the use of any mercury-containing equipment or materials.
4.
Other specific activities designed to reduce or eliminate mercury loadings.
5.
An identification of the facility’s responsibilities under P.L.225-2001 (also known as House Enrolled Act 1901 of the
2001 legislative session). P.L.225-2001 outlines the restrictions on the sale or supply of mercury-added novelties,
mercury-added products, and mercury commodities, and on the use or purchase of mercury commodities, compounds,
or mercury-added instructional equipment and materials by public and non-public schools. In order to satisfy the
requirement of this part, include a written statement that attests to the fact that an identification of the responsibilities
under P.L.225-2001 has been undertaken.
Deleted: '
For each planned activity identified under section A. above, include the following: (see 327 IAC 5-3.5-9(a)(4))
B.
1.
The goal to be accomplished.
2.
A measure of performance.
3.
A schedule for action. The schedule required under this part should be expressed in terms of months from the date of
NPDES permit issuance, renewal, or modification that incorporates the approved SMV. It is recommended that the
schedule required under this part be developed in conjunction with the other schedules for action required by the SMV
application.
C.
Provide an identification of the resources and staff necessary to implement the Pollutant Minimization Program Plan (PMPP). (see 327
IAC 5-3.5-9(a)(6)) The identification should indicate the source and amount of funding available to implement the PMPP, as well as the
number and position of employees that will be devoted to PMPP implementation.
PART FOUR – MERCURY MONITORING DATA
Provide all available influent and effluent mercury data for the two-year period preceding submittal of this application. Additionally, provide any
information on mercury in biosolids for the two-year period preceding submittal of this application, if available. The data may be supplied on a
separate form, but must include results for each individual sample (including unit of measurement and U.S. EPA method), the date the sample was
taken, and the analytical laboratory where the analysis was performed. (see 327 IAC 5-3.5-9(a)(5))
Influent
Date (month, day, year)
Result
Industrial Streamlined Mercury Variance Application
State Form 52111 (5-05)
ng/l
U.S. EPA Method
Analytical Laboratory
4
American LegalNet, Inc.
www.FormsWorkflow.com
PART FOUR (CONTINUED)
Effluent
Date (month, day, year)
Result
ng/l
U.S. EPA Method
Analytical Laboratory
Result
Unit
U.S. EPA Method
Analytical Laboratory
Biosolids
Date (month, day, year)
PART FIVE – POLLUTANT MINIMIZATION PROGRAM PLAN (PMPP) ADDITIONAL REQUIREMENTS
A.
Proof of Public Notice Activities: Provide proof of the public notice activities identified below: (see 327 IAC 5-3.5-9©)
For the notice of availability required under Section A.1. provide a copy of the notice as it appears in the newspaper. For the
posting requirements under Section A.2. attest to that fact that the information was posted as required in a written statement.
1.
Publish notice of the availability of the draft pollutant minimization program plan (PMPP) in a daily or weekly newspaper of general
circulation throughout the area affected by the discharge.
2.
Deleted: (c)
Post a copy of the information required by this section at the following:
a. Principal office of the municipality or political subdivision affected by the facility or discharge.
b. The United States post office.
c. If one is available, the library serving those premises.
3.
All notices published under this section shall contain the following information: (see 327 IAC 5-3.5-9(d))
a. The name and address of the applicant that prepared the PMPP.
b. A general description of the elements of the PMPP.
c. A brief description of the activities or operations that result in the discharge for which an SMV is being requested.
d. A brief description of the purpose of this notice and the comment procedures.
e. The name of a contact person, a mailing address, an Internet address, if available, and a telephone number where
interested persons may obtain additional information and a copy of the PMPP.
4.
The applicant shall do the following: (see 327 IAC 5-3.5-9(e))
a. Provide a minimum comment period of thirty (30) days.
b. Include a copy of the comments received and the applicant’s responses to those comments in the SMV application
submitted to the department.
B.
Deleted: '
Annual Reports: Provide a schedule for the submission of the annual reports required under 327 IAC 5-3.5-9(a)(8).
Generally, the annual reports should be submitted each year on the anniversary of the effective date of the NPDES permit
that incorporates the approved SMV. A proposed schedule with an alternative submittal date is subject to IDEM’s approval.
The annual reports shall include a description of the facility’s progress toward fulfilling each PMPP requirement, mercury
monitoring results, and steps taken to implement each planned activity developed under the PMPP.
Industrial Streamlined Mercury Variance Application
State Form 52111 (5-05)
Deleted: '
Deleted: '
5
American LegalNet, Inc.
www.FormsWorkflow.com