STATE OF CALIFORNIA
DEPARTMENT OF REAL ESTATE
SUBDIVISIONS
PLANNED CONSTRUCTION STATEMENT
Read instructions on reverse
side before completing.
RE 611A (Rev. 7/00)
Size or
Quantity
Description and Location
(include type of construction, materials, electrical and mechanical
features, as well as common area lot number/letter)
Cost
Estimate
Estimated
Percent
Completion
Complete
Date
American LegalNet, Inc.
www.FormsWorkflow.com
RE 611A — Reverse
INSTRUCTIONS
✔ The Planned Construction Statement is to be attached and made part of RE 611 (Bond - Completion of Common
Facilities) or any other form of acceptable financial guaranty. (If other than a bond, submit proposed instrument to DRE
for approval.)
✔ List and describe, in sufficient detail for verification by the Department of Real Estate, the construction features to be
bonded for completion. If the subdivision has multiple common area lots, identify the lots upon which the facilities will
be constructed. If phased, also identify the phase number. Use a separate RE 611A for each phase.
✔ Attach a copy of the overall Project Plot Plan (reduce if necessary), no larger than 11" x 16".
✔ If completion dates for construction are more than one year in the future, add cost increase factor based on your best estimate
to reflect inflationary factors.
✔ If the common facilities are partially completed and only a portion of the construction will require a financial guaranty,
complete the attached Subdivider Statement (RE 611C) and submit with RE 611A.
Sample: PLANNED CONSTRUCTION STATEMENT
Size or
Quantity
Description and Location
(include type of construction, materials, electrical and mechanical
features, as well as common area lot number/letter)
Cost
Estimate
Estimated
Percent *
Completion
Complete
Date
20' x 40'
Pool, Masonry-Gunite, plastered, with associated
plumbing, 1-180,000 B.T.U. Heater, filter-type, 1-1/2
h.p., circulating pump, automatic chlorinator. (Lot 12)
$
12,500
80%
June 1992
65,450 S.F.
Sodded blue grass, etc. (Lot B)
$
50,000
70%
June 1992
45,000 S.F.
Ground cover — describe type. (Lot E)
$
20,000
0%
June 1992
10 25-gallon
Trees — Shrubs, etc. – describe type, size and quantity
(Lot C)
$
750
25%
June 1992
110,450 S.F.
Sprinkler System, Automatic Timers, etc. (Lots B, C,
and E)
$ 125,000
0%
May 1992
25,000 S.F.
Private Roads and Driveways – describe pavement
materials and depth. (Lots A, D and F)
$
20%
July 1992
TOTAL COST
20%
TOTAL ADJUSTED COST
*
40,000
$ 248,250
$
49,650
$ 297,900
Only reflect percentage completed for which all costs associated with work complete have been paid in full.